Construction Projects Weekly 411

East Washington Street Extension (McIntosh Parkway – Anticipate completion by late 2018 early 2019. Minimal impact on commuters.

East Washington Street Extension (McIntosh Parkway) – completion date, 640 days from Notice to Proceed, December 2018

Construction continues on the East Washington Street Extension project, otherwise known as McIntosh Parkway.  Grading is nearing completion for the segment from Greison Trail to near Ashley Park.  Included in this section is the completion of several concrete box culverts, and the installation of storm sewers, and a sanitary sewer main and water main.

The construction of a roundabout intersection at Greison Trail is underway.  This has necessitated the closure of Greison Trail from Berry Avenue to Park Lane at Chastain Park.  The work to construct the roundabout is scheduled to take about 3 months to complete (through September).  The closure of Greison Trail will expedite construction and maximize the safety of the construction workers.

Detour signs for Greison Trail are posted.  The detour directs southbound through traffic to Berry Avenue to Roberts Road to East Broad Street, back to Greison Trail.  Northbound through traffic is directed to East Broad Street to Roberts Road to Berry Avenue, back to Greison Trail.  Access will be maintained to all of the businesses and residential neighborhoods from Greison Trail.

Utility work on the existing section of East Washington Street also continues.  This has necessitated the closure of East Washington Street, periodically, between Farmer Street and Roberts Road.  Local access is maintained.This project consists of the construction of a connector roadway from East Washington Street to McIntosh Parkway. The proposed roadway is to be a two-lane road from Farmers Street to Greison Trail and a four-lane road from Greison Trail to the east terminus. The intersection with Greison Trail is to be a roundabout.

 The project consists of approximately 0.4 miles of existing roadway widening/ reconstruction, and one mile new roadway construction.

Southeastern Site Development is the prime contractor. 
Columbia Engineering is the design Engineer of Record

The cost of construction is $6,145,998.18, with the City of Newnan having received a grant in the amount of $1,754,000 from the State Road and Tollway Authority.

Construction continues on the East Washington Street Extension project, otherwise known as McIntosh Parkway.  Grading is nearing completion for the segment from Greison Trail to near Ashley Park.  Included in this section is the completion of several concrete box culverts, and the installation of storm sewers, and a sanitary sewer main and water main.

Next up- the construction of a roundabout intersection at Greison Trail.  This will necessitate the closure of Greison Trail from Berry Avenue to Park Lane at Chastain Park, for approximately 3 months.  The schedule for closure will begin next week and continue through late September.  Closure of the road will expedite construction and maximize safety of the construction workers.

Detour signs will be posted.  The detour will direct southbound through traffic to Berry Avenue to Roberts Road to East Broad Street, back to Greison Trail.  Northbound through traffic will be directed to East Broad Street to Roberts Road to Berry Avenue, back to Greison Trail.  Access will be maintained to all of the businesses and residential neighborhoods from Greison Trail.


LMIG 2017 

11/13/17 update: Paving has begun in the Summergrove area
Maintenance work will soon begin on local streets in the City of Newnan, and includes the variable depth milling and resurfacing of approximately 4.21 centerline miles on 14 streets, and the application of thermoplastic traffic stripe and pavement markings. 

Baldwin Paving Company, Inc., has been awarded a contract for the work with a base bid amount of $1,072,643.93. 

The City received funding assistance through the Local Maintenance Improvement Grant program (LMIG FY 2017,) from the Georgia Department of Transportation (GDOT) in the amount of $355,515.84.  The City has a required 30% match for the amount received from GDOT.

The list of streets includes::
Savannah St

Jefferson Pkwy

Lake Forest Dr

Rollingbrook Vista

Corbel Way

Brookside Dr

Featherston Dr

Winfield Dr

Cumberland Gap

Shady Oak Ln

Poplar St

Oak St

Covington Terrace

Armory Rd